top of page

Completed Projects

Overcoming Challenges

Using Vegetable Oil Instead of Transformer Oil as an Insulation Material in Distribution and Power Transformers

25 November 2022

Sakarya Electricity Distribution Inc. The R&D project " Using Vegetable Oil Instead of Transformer Oil as an Insulation Material in Distribution and Power Transformers ", which is in the category of EMRA July 2021 Climate Environment and Emergency Action Plans, which we have continued under the leadership of EPDK, together with the use of vegetable oil instead of imported petroleum-based oils used in transformers; It aims to reduce foreign dependency, increase the fire resistance of transformers and increase their safety levels, and ensure the use of environmentally friendly products in production. Our stakeholders are Ondokuz Mayıs University academicians and Balıkesir Elektromekanik Sanayi Tesisleri A.Ş. This project, which we carried out together with our company, was successfully completed in a 13-month period and a prototype product was produced.

Using R410A Gas Instead of Transformer Oil as an Insulation Material in Distribution and Power Transformers

February 25, 2023

Vangölü Electricity Distribution Inc. The R&D project " Using R410A Gas Instead of Transformer Oil as an Insulation Material in Distribution and Power Transformers ", which is in the Material Technology category of the Energy Market Regulatory Authority (EMRA) July 2021 period, which we have carried out under the leadership of our leadership, is based on oil, which is used for insulation in transformers and whose resistance to electric field intensity is unstable compared to gases. instead of based transformer oils; It aims to use R410A gas, which is safer, environmentally friendly , economical and has low maintenance costs, and will be used as insulation in transformers for the first time in our country and Europe. Our stakeholders are the academicians of Ondokuz Mayıs University and Balıkesir Elektromekanik Sanayi Tesisleri A.Ş. This project, which we carried out together with our company, was successfully completed in a 13-month period and a prototype product was produced.

Pilot Application of a New Method and Life Counter Development for Calculating Hot-Spot Temperature in Distribution Transformers

May 10, 2023

Aras Electricity Distribution Inc. The R&D project " A New Method for Calculating Hot-Spot Temperature in Distribution Transformers and Life Counter Development Pilot Application", which is in the Communication and Smart Meter category of EMRA 2021 July period, which we have carried out under the leadership of the Energy Market Regulatory Authority , is the highest temperature in the transformer due to overheating resulting from overloading of transformers. It aims to prevent aging and loss of life due to the Hot-Spot temperature, also called winding temperature. At the end of the project, with the Life Counter, which we created as a prototype product with high added value to our country ; Calculating the remaining life of the transformer depending on its aging rate, electrical parameters; A transformer monitoring system has been developed that allows analysis, recording, alarms and reporting of various values.

En energy 5G

24 January 2 0 23

Trakya Electricity Distribution Inc. The " Energy 5G " R&D project, which is in the Communication Technology category of the EMRA July 2021 period, which we have carried out under the leadership of EPDK , aims to investigate the different effects that 5G communication networks may have on the electricity distribution systems (Geographic Information Systems, SCADA, etc.) in the field, and to check the 5G compatibility of the existing systems of distribution companies. It includes the identification, preparation of a road map together with stakeholders regarding the implementation of new business models to be developed, and presentation of legislative recommendations. This project, which we have carried out extensively together with our stakeholder Eskişehir Osmangazi University academicians, has been successfully concluded within a 12-month period.

Reduction of Emissions Transferred from Battery Storage Systems to the Grid

July 25, 2023

Meram Electric Distribution Inc. The "Reduction of Emissions Transferred from Battery Storage Systems to the Grid" R&D project, which is in the category of Reducing Technical and Non-Technical Losses and Business Processes in the EMRA January 2022 period, which we have carried out under the leadership of EPDK, aims to contribute to the optimization of the Turkish Electricity Grid, reducing losses and improving power quality by increasing the upper frequencies. is targeted.

Determination of Global Warming Potentials of Electricity Distribution Systems with a Life Cycle Assessment Approach and Developing Solution Recommendations for Reduction

1 September 5, 2023

Boğaziçi Electricity Distribution Inc. The R&D project "Determining the Global Warming Potentials of Electricity Distribution Systems with a Life Cycle Assessment Approach and Developing Solution Recommendations to Reduce", which is in the category of EMRA 2021 July Climate Environment and Emergency Action Plans, which we have carried out under the leadership of EPDK, starts from the raw material acquisition of a process/service/product and also includes transportation. Life Cycle Assessment (LCA), which is a cradle-to-grave approach that covers and ends with waste management, has been carried out. Within the scope of the project, Boğaziçi Elektrik Dağıtım A.Ş. An application was developedfor LCA calculations for 21 components in the inventory and the Carbon Footprint was calculated.

Adsız tasarım.png

Hybrid Transformer Design and Manufacturing

June 16, 2023

Aras Electricity Distribution Inc. The " Hybrid Transformer Design and Manufacturing " R&D project, which is in the Grid Operation category of EMRA January 2022 period, which we have carried out under the leadership of EPDK, is a result of the increasing integration of renewable energy sources into distribution networks, causing power quality problems such as voltage fluctuations, especially in the 400V low voltage distribution network, and changing distribution systems. A new hybrid transformer was designed and successfully manufactured to suit the topology and eliminate power quality problems. The produced prototype product was placed in the field and put into use.

Work Safety Enhancing Smart Vest

May 30, 2023

Sakarya Electricity Distribution Inc. The "Occupational Safety Enhancing Smart Vest " R&D project, which is in the Occupational Health and Safety category of EMRA 2021 July period, which we have carried out under the leadership of EPDK, is a project in which we aim to prevent injuries and deaths due to accidents experienced by field employees of Electricity and Natural Gas Distribution Companies every year . In this context, in order to minimize occupational safety with new and advanced technologies, a Smart Vest with an IoT system was developed as a prototype product and an application interface was designed for the remote monitoring system.

Resim2_edited.jpg
bottom of page